View Abu Dhabi, U.A.E - Places of Interest in a larger map
22/08/2010 (Sun)
This morning I arrived at work on time at 08:30, I was quickly briefed on what needed to be done throughout the course of the day. I continued to follow on from what I began with on the Reem Island Najmat project, where I completed two blow-up pages showing the extents of certain areas of the masterplan for dimesnioning (part of what is required for a breifing package for an architectural fabric company-shading structures) yesterday evening as mentioned. Once these were complete I began with some contextual illustrative diagrams showing various physical site elements and typologies relative to site pedestrian circulation. Once both of these blow-up plans were finished I had to compile various material (varying scales and context of topography, scale and context by cross sectioning, precedents of possible shading structures etc..) onto an InDesign document to ensure this briefing package was ready for submition as scheduled.
No comments:
Post a Comment